Two teams, one opening day
A regional hospital is opening a new outpatient wing. The building works (design, construction, fit-out) are managed predictively, with stage gates, a fixed contract and a detailed schedule. The new patient portal (online booking, check-in kiosks, test results) is developed by an agile team in two-week sprints.
Each part is well managed on its own. The construction manager reports earned value every month; the portal's Product Owner shows a burn-up chart at every sprint review. Yet the hospital's board feels it has no clear picture. Two reports, two vocabularies, and nobody can answer: “Will the wing open on time, with everything working?”
Then a problem appears at the boundary: the check-in kiosks need the building's network, which is scheduled for the very end of construction. The portal team cannot test kiosk features until then.
This lesson explains how a project manager integrates a hybrid project: one plan with two rhythms, managed interfaces, one change and risk process, and one honest report.