Home › PMP lessons › Agile Metrics & Events

PMP lesson · Agile Metrics & Events · Agile metrics · lesson 4 of 5 · about 25 minutes

The cumulative flow diagram: reading flow and spotting bottlenecks

Agile, KanbanFree preview
Goal: After this lesson you can build and read a cumulative flow diagram, measure WIP, throughput and approximate lead time from it, recognize the patterns of bottlenecks, blockers and growing demand, and choose a sensible response to each pattern.
Open the full lesson →This page is a preview. The full lesson, with examples, traps and exam questions, is in the PMCLEAR app.

1The situation

“Everyone is busy, so why is nothing finished?”

A software team at a regional insurance company develops small improvements to its claims system. Its Kanban board has four columns: To do, In progress, Testing and Done. For two weeks the developers have been busy, the board is full of cards, and yet the business owner says almost nothing new has reached users.

The daily stand-up does not explain it: everyone reports progress. Each individual card looks fine. The problem is in the system, and you cannot see a system by looking at one day's board.

The cumulative flow diagram (CFD) shows the history of the whole board on one chart. In this case it shows a striking pattern: the Testing band is getting wider every day while the Done line is flattening. Work is piling up in front of the single tester.

This lesson teaches you how a CFD is built, how to read the five things it shows, and what to do about the patterns you find.

2What a cumulative flow diagram is

A CFD is a stacked area chart. The horizontal axis is time (days or weeks). The vertical axis is the cumulative number of items that have reached each stage of the workflow. Each stage of the board becomes one colored band.

“Cumulative” is the key word. The top line shows all items that have ever arrived on the board; the next line shows all items that have ever started; and so on down to the bottom line, all items that have ever been finished. Because these are running totals, the lines never go down (unless items are removed from the board).

The CFD was popularized for software by David Anderson's work on Kanban in the 2000s, but the idea comes from manufacturing and queueing theory. It is one of the most information-rich charts in agile and Lean practice.

A CFD shows, over time, how many items have reached each stage. Lines only rise or stay flat.

3See it in one picture: a bottleneck in testing

Cumulative flow diagram with a testing bottleneck010203040500246810To doIn progressTesting (widening)DoneDayItems (cumulative)
Over ten days, the yellow Testing band grows from 1 to 17 items, while the green Done line flattens. Developers keep starting work, but it waits in front of testing. Testing is the constraint.

4How it looks on the exam

Exam-style question 1. A team's cumulative flow diagram shows the band for “Code review” growing wider every day, while the bands before and after it stay roughly constant. What should the team do first?
A. Add more developers so that more items enter code review
B. Stop starting new work and help clear the code review queue
C. Remove the code review stage from the workflow altogether
D. Ask the product owner to add more items to the backlog
Show the answer and the decode
Answer: B.
What it means
One band widening: a bottleneck at code review.
What is the question really asking?
The first response.
Key words / trigger
“growing wider every day”
PMP logic
Work enters code review faster than it leaves. Stop adding work upstream (limit WIP) and swarm on reviews; then look for lasting fixes such as more reviewers or smaller changes. If the band were stable, no urgent action would be needed.
Why the wrong answer looks attractive
A: more developers produce more code waiting for review. C: removing a quality step creates defects; fix the flow instead. D: more backlog does not help a bottleneck.

5Remember this

Your memory card

  • A CFD stacks the cumulative count of items in each stage over time; lines never go down
  • Vertical distance = WIP in a stage · slope of Done = throughput · horizontal distance ≈ average lead time
  • A band widening over time = bottleneck at or after that stage
  • Flat line = blocked; flat Done = nothing delivered
  • Top line steeper than Done = demand above capacity → prioritize
  • Bottleneck: limit WIP upstream and swarm on the constraint (theory of constraints)
  • Healthy flow: roughly parallel bands, steady Done slope
The full lesson in the PMCLEAR app also has:
  • the rest of the lesson (How to build one, Reading 1: work in progress, Reading 2: throughput, Reading 3: approximate lead time, Reading 4: bottlenecks, Reading 5: blockers and demand, Responding to the patterns, Little's Law and the CFD together, Common mistakes when building a CFD, What a healthy CFD looks like, CFD versus burn-up and burn-down charts, Using CFDs in predictive and hybrid projects, Glossary, Sources and further reading)
  • a worked example
  • the common traps (wrong vs right)
  • 5 exam-style questions with the decode
  • a 3-question quick check
Open the full lesson → Create a free account

Sign up free and get 5 days of complimentary full access: exam simulations and 2,000 exam-level questions, clearly explained, also in your own language. Your progress stays saved.