The gripper keeps dropping parts
During the robot cell's first production week, the gripper drops parts several times a shift. Everyone has a theory: worn suction cups, oily parts, low air pressure, a changed teach point.
You need to do three things: list all possible causes systematically, find out which problems happen most often, and check whether one factor really drives the defects.
Each of those questions has its own quality tool.