Home › Lean Six Sigma

Lean Six Sigma Fundamentals · CPD / PDH

Learn Lean Six Sigma

Complex Concepts. Clear Content. Realistic Engineering Examples. Practical Skills.

Start learning Lean Six Sigma with PMCLEAR's 7-hour introductory course. Understand how companies reduce waste, improve quality, solve production problems, and make processes more efficient.

No previous Six Sigma experience required.

Try Lesson 1 Free →See the 12 lessons

CA$80 + applicable taxes for 9 months of access. Lesson 1 is free with a PMCLEAR account, no card needed.

7 hoursof training
12lessons
Self-pacedlearning online
Certificateof completion

Why learn with PMCLEAR?

Complex Concepts. Clear Content.

Each difficult idea is explained in three steps: a clear explanation, a practical example, then the professional terms and calculations. Voice-guided narration with Bella, with optional extra explanations and step-by-step calculations.

Learn With Realistic Engineering Examples

Discover how Lean Six Sigma works in manufacturing, production, quality control, and everyday business operations.

Learn at Your Own Pace

Study online with structured lessons, illustrations, knowledge checks, and progress tracking.

Practice What You Learn

Explore practical problems involving waste reduction, defects, process improvement, and root-cause analysis.

What each lesson includes

Every lesson follows the same structure and takes 20 to 40 minutes.

Learn

Plain-English teaching with diagrams, key terms, a realistic engineering example and a worked example.

Practise

Two practical exercises with model answers, where you analyze data and make a decision, and six knowledge-check questions with explanations.

Prove it

Your progress is recorded lesson by lesson. A practical case study, then a 40-question final assessment, pass mark 80%, with an explanation for every question.

The 12 lessons

Four parts, about 7 hours in total, including the exercises, knowledge checks and the final assessment. The time shown for each lesson is its reading and listening time.

Part A — Lean Foundations

Part A overview: Lean foundations lessons and main topics
  1. LSS-01 What Is Lean Six Sigma? 25 min
  2. LSS-02 Value, Customers and Variation 30 min
  3. LSS-03 The Eight Wastes of Lean 35 min
  4. LSS-04 5S and the Visual Workplace 25 min
  5. LSS-05 Continuous Improvement: Kaizen and PDCA 25 min

Part B — The DMAIC Method

Part B overview: the five DMAIC phases
  1. LSS-06 DMAIC Part 1: Define and Measure 25 min
  2. LSS-07 DMAIC Part 2: Analyze, Improve and Control 20 min

Part C — Problem-Solving Tools

Part C overview: SIPOC, Pareto, fishbone, 5 Whys and FMEA
  1. LSS-08 SIPOC and Process Mapping 25 min
  2. LSS-09 Pareto Charts and Root Cause Analysis 20 min
  3. LSS-10 Fishbone Diagrams and the 5 Whys 20 min
  4. LSS-11 Introduction to FMEA and Process Control 25 min

Part D — Putting It Together

Part D overview: manufacturing improvement case study
  1. LSS-12 Case Study: Improving a Stamping Line 40 min
  2. Final Final assessment, 40 questions 45 min

Try Lesson 1 Free →

Course certificate

When you complete all 12 lessons and pass the final assessment (40 questions, pass mark 80%), you receive the PMCLEAR Lean Six Sigma Fundamentals — Certificate of Completion, with a unique ID that anyone can check at pmclear.com/verify.

Sample certificate: PMCLEAR Lean Six Sigma Fundamentals, Certificate of Completion (marked SAMPLE)

Issued by PMCLEAR as the training provider. This is a certificate of course completion. It is not an ASQ or IASSC certification.

CPD / PDH for practising engineers

Lean Six Sigma Fundamentals — 7 Hours — CA$80 + applicable taxes. Develop practical skills in process improvement, quality management, waste reduction and engineering problem-solving. This course may be used as a CPD / PDH learning activity, subject to the requirements of your professional regulator.

Your certificate shows the course title, PMCLEAR as the training provider, the planned course duration of 7 hours, your documented learning time, the completion date, the assessment result and a verification ID. The course is also listed on the CPD / PDH page. It is the same course, with one account and one training record.

CPD / PDH eligibility and acceptance depend on the requirements of your professional regulator. PMCLEAR provides evidence of course completion but does not guarantee regulatory acceptance.

Questions

How much does the course cost?

CA$80 + applicable taxes, one payment, for 9 months of access to all 12 lessons, the knowledge checks, the final assessment and the certificate. Lesson 1 is free with a PMCLEAR account, so you can try the course before you pay. A failed final assessment can be retaken at no extra cost.

Do I need Six Sigma experience?

No. The course starts from zero.

How long does it take?

About 7 hours. You can study at your own pace and continue where you stopped.

How is the course delivered?

Online and self-paced. Every lesson has the full text with diagrams and voice-guided narration. You can listen or read, pause, replay a section and change the playback speed.

Is the certificate ASQ or IASSC certification?

No. It is a PMCLEAR Certificate of Completion. It shows you completed the course and passed the final assessment. Each certificate has an ID that anyone can check at pmclear.com/verify.

Can I use this course for CPD / PDH?

This course may be used as a CPD / PDH learning activity, subject to the requirements of your professional engineering regulator. CPD / PDH eligibility and acceptance depend on the requirements of your professional regulator. PMCLEAR provides evidence of course completion but does not guarantee regulatory acceptance.

Lean Six Sigma Fundamentals — CA$80 + applicable taxes
12 lessons · 7 hours · 9 months of access · Certificate of Completion · Lesson 1 free

Try Lesson 1 Free →

Already studying with PMCLEAR? Write a review.

PMCLEAR is an independent course provider. It is not affiliated with or endorsed by ASQ (American Society for Quality) or IASSC (International Association for Six Sigma Certification).

★ Read all student reviews · Rate your course

Complex Concepts. Clear Content.