Manage quality vs control quality (and control charts)

All approachesFree preview
Goal: After this lesson you can tell quality assurance from quality control, read a control chart, and apply the rule of seven.
Open the full lesson →This page is a preview. The full lesson, with examples, traps and exam questions, is in the PMCLEAR app.

1The situation

Everything is within limits… isn't it?

Two things happen in the same week. A quality audit finds that the welding team has been skipping the pre-weld checklist for six weeks. And the weld thickness chart shows the last seven samples all above the average, although every value is still inside the limits.

The production supervisor says: “No defects, all within limits: no problem.”

He is wrong twice. The first issue is about the process; the second is a pattern in the product data. Both need action.

2Process vs product

Quality management has two sides:

Manage quality
Process (assurance)
Are we following the quality plan, and is the process working? Audits, process improvement.
Control quality
Product (control)
Does this deliverable meet its specification? Inspection, testing, measurement.
Exam shortcut: audit, process, “are we following procedures?” → manage quality · inspect, measure, test the deliverable → control quality.

3A control chart with a warning

UCL LCL mean 7 in a row above the mean→ investigate, even inside the limits Weld thickness (mm) by sample
All points are inside the limits, but the last seven (red) are above the mean: the process has shifted.

4How it looks on the exam

Exam-style question 1. A control chart shows the last seven measurements above the mean, although all are within the control limits and within specification. The supervisor says no action is needed. What should the project manager do?
A. Agree, since all values are within limits
B. Treat the pattern as a sign that the process may be out of control and investigate the cause
C. Widen the control limits
D. Reject the last seven batches
Show the answer and the decode
Answer: B.
What it means
Everything is within limits, but there is a run of seven on one side.
What is the question really asking?
Whether to act.
Key words / trigger
“last seven measurements above the mean”
PMP logic
Rule of seven: a non-random pattern suggests an assignable cause.
Why the wrong answer looks attractive
'Within limits' sounds conclusive, but patterns matter too.

5Remember this

Your memory card

  • Manage quality = process, audits · Control quality = product, inspection
  • Control chart: mean, UCL/LCL (from the process) vs spec limits (from the customer)
  • Outside limits or 7 in a row on one side → investigate
  • Don't wait for defects; correct process non-compliance now
The full lesson in the PMCLEAR app also has:
  • the rest of the lesson (Reading a control chart, Control limits vs specification limits)
  • a worked example
  • the common traps (wrong vs right)
  • 2 exam-style questions with the decode
  • a 3-question quick check
Open the full lesson → Create a free account

Sign up free and get 5 days of complimentary full access: exam simulations and 2,000 exam-level questions, clearly explained, also in your own language. Your progress stays saved.