Free PMP exam questions with answers
41 free PMP practice questions with answers and explanations. The first 20 are exam-level scenario questions like the real PMP exam: several answers look right, and only one is the best. Choose your answer, then open the explanation.
How to use these questions
Answer each question before you open the explanation. Look for the key words in the question: they decide the answer. When you get one wrong, open the free lesson linked under it. Want more? PMCLEAR has 2,000 PMP exam questions and 96 lessons, including timed 45, 90 and 180-question practice exams.
Create a free account → PMP lessons
Creating an account is free. Full access is free for a limited time after you sign up; after that you can choose a paid plan. Your progress stays saved.
Exam-level scenario questions (20)
Question 1 People · Agile
During daily standups, one senior developer routinely spends several minutes explaining technical details and interrupting others. Over three sprints, the rest of the team has grown noticeably quieter and the standup now runs close to thirty minutes. Two members have privately told the project manager they no longer see the point of attending. What should the project manager do first?
Show the answer and explanation
Answer: A. PMI expects the project manager to address individual behaviour with the individual, privately and directly, before involving the group or anyone else.
🗝 Key words: “do first”
PMP rule: Individual behaviour is handled one-on-one first. Escalation and group forums come only after a direct conversation has failed.
Why the other answers are wrong:
- B. This treats the symptom. A timer may shorten the meeting without restoring participation, and the underlying behaviour is unaddressed.
- C. Retrospectives are for team process, not for confronting one person's conduct. Raising it there first risks embarrassing the developer and damaging trust.
- D. Escalating to a functional manager is premature. The project manager has not yet spoken to the person themselves.
The trap: Three options are all things you might legitimately do. Only one is the correct starting point. 'First' turns a list of reasonable actions into a sequencing question.
📘 Free lesson: Conflict management: five techniques and when to use each
Question 2 People · Hybrid
Two senior engineers disagree about which control architecture to use for a key subsystem. The disagreement has surfaced in the last three status meetings, each time consuming most of the agenda, and the design milestone is now a week behind. Both engineers are highly respected and each has a defensible technical position. What is the best action for the project manager?
Show the answer and explanation
Answer: A. Collaborating and problem-solving is the preferred conflict resolution mode. Structured criteria turn an argument about opinions into a decision about evidence.
🗝 Key words: “best action”
PMP rule: Collaborate/problem-solve is the highest-value conflict mode. Give the disagreement a structure and it usually resolves itself.
Why the other answers are wrong:
- B. Deciding by seniority is forcing. It resolves the schedule issue but leaves the losing engineer disengaged and the technical rationale undocumented.
- C. The sponsor is not the right decision maker for a technical trade-off the team is capable of resolving. Escalating first is a common wrong answer.
- D. Building both is waste and does not resolve the conflict. It defers the decision at real cost.
The trap: The schedule pressure in the stem tempts you toward the fastest option. Speed is not the criterion. The exam rewards resolving the conflict properly, not clearing the agenda.
📘 Free lesson: Conflict management: five techniques and when to use each
Question 3 People · Agile
A team has failed to complete its sprint commitment in four consecutive iterations. Carry-over is growing and the release forecast has slipped twice. A senior manager instructs the project manager to add two developers to the team immediately to recover the shortfall. What should the project manager do next?
Show the answer and explanation
Answer: A. The cause is unknown. A retrospective is the team's own mechanism for surfacing it, and it must come before a structural change to the team.
🗝 Key words: “next”
PMP rule: Diagnose before you change the system. On an adaptive team, the retrospective is the diagnostic instrument.
Why the other answers are wrong:
- B. Acting on the instruction without diagnosis may make things worse. New members reduce velocity while they onboard, and the real cause is untouched.
- C. Reducing commitment may be a valid outcome of the retrospective, but choosing it now is guessing.
- D. The point is defensible but it is an argument, not an action, and it still skips the diagnosis. Rejecting a manager's instruction is rarely the exam answer.
The trap: The instruction from a senior manager creates false urgency. An instruction in the stem does not make compliance the correct answer.
📘 Free lesson: The Sprint Retrospective: improving how the team works
Question 4 People · Hybrid
A project team is spread across three time zones. All meetings are held at a time that suits the largest group in Toronto. Over the last month, Kenji and Ana, who join from the least convenient time zone, have stopped raising issues in meetings, although their written updates show they are aware of several risks. The sponsor suggests simply rotating the meeting time. What should the project manager do FIRST?
Show the answer and explanation
Answer: A. The PM does not yet know why they went quiet; it may be time zone, fatigue or something else. Understanding first means any change, including rotation, actually addresses the real cause.
🗝 Key words: “have stopped raising issues in meetings”
PMP rule: Before changing team practices, the project manager seeks to understand the cause of disengagement by talking to the people affected.
Why the other answers are wrong:
- B. Rotation may help, but it assumes the time zone is the cause. Acting on the sponsor's suggestion before understanding the reason may not restore participation and inconveniences everyone else.
- C. This captures their issues but reduces them to passive contributors who rely on the PM to speak for them. It works around the participation problem rather than finding and fixing its cause.
- D. Logging the risks is useful, but it is a documentation step that deals with the content, not with why two members have stopped speaking up. The engagement problem would remain.
The trap: Rotating meetings is tempting because the sponsor suggested it and it seems fair, but it acts before understanding the cause.
📘 Free lesson: Conflict management: five techniques and when to use each
Question 5 People · Predictive
A normally strong team member has missed three consecutive deliverables and has been arriving late. Other team members have quietly absorbed the work and one has complained to the project manager about the imbalance. The project manager is aware the team member is dealing with a family illness. What should the project manager do first?
Show the answer and explanation
Answer: A. Speak to the person before acting on their behalf. The plan is agreed with them, not decided for them.
🗝 Key words: “first”
PMP rule: Confidentiality and direct conversation govern personal performance issues. Never discuss one member's private circumstances with the team.
Why the other answers are wrong:
- B. Reassigning work without speaking to the person removes their agency and may be entirely unnecessary if a short adjustment would do.
- C. Disclosing a colleague's personal circumstances to the team is a confidentiality breach, however well intended.
- D. This may be a useful part of the conversation, but offering it before you have spoken to them makes it a deflection rather than support.
The trap: The complaint from the other member pulls you toward addressing the team. The exam wants the affected individual handled first, and privately.
📘 Free lesson: Conflict management: five techniques and when to use each
Question 6 Process · Predictive
At the end of the monthly reporting period, the project shows a CPI of 0.85 and an SPI of 1.06. Helena, the sponsor, must brief the steering committee in an hour and asks the project manager to explain the position and recommend an action. The finance controller remarks that being ahead of schedule should balance out the cost problem. Which statement and action should the project manager give?
Show the answer and explanation
Answer: A. CPI below 1 means over budget and SPI above 1 means ahead of schedule. Investigating the cause comes before choosing a correction, which is why it beats releasing resources without analysis.
🗝 Key words: “CPI of 0.85 and an SPI of 1.06”
PMP rule: CPI below 1 indicates over budget and SPI above 1 indicates ahead of schedule; analyse the cause of a variance before choosing corrective action.
Why the other answers are wrong:
- B. This reverses the meaning of both indices. A CPI below 1 shows overspending, not underspending, and an SPI above 1 shows the work is ahead, not behind.
- C. The diagnosis is right, but cutting resources before knowing why costs are high may not fix the overspend and could damage the schedule. The action skips the needed analysis.
- D. SPI above 1 means the project is ahead of schedule, so it is not behind. Rebaselining is also premature when the cause of the cost variance is unknown.
The trap: Option C has the correct diagnosis and seems decisive, but it acts on the cost problem without understanding its cause.
📘 Free lesson: Earned value basics: PV, EV, AC, variances and performance indexes
Question 7 Process · Hybrid
During execution, Daniel, a team member, identifies a threat that was never captured during planning. An initial discussion suggests it is both likely and damaging to the next delivery. No response has been planned, and Sofia, the lead engineer, urges the project manager to start a mitigation immediately because 'there is no time for paperwork'. The team is waiting for direction. What should the project manager do NEXT?
Show the answer and explanation
Answer: A. The threat has not occurred yet, so there is time to analyse it. A quick assessment confirms its priority and leads to a response that fits, instead of acting on an initial impression.
🗝 Key words: “no response has been planned”
PMP rule: A newly identified risk is recorded and analysed before a response is selected and implemented.
Why the other answers are wrong:
- B. Acting fast is tempting, but the threat has only been discussed briefly. Choosing a mitigation before assessing probability and impact may waste effort on the wrong response.
- C. Management reserve is for unknown risks and requires approval; this risk is now identified. Requesting funds before the risk is analysed and a response is chosen is also out of sequence.
- D. Being missed in planning does not make a risk the sponsor's decision. The PM and team can analyse and respond within their authority; escalating now is premature.
The trap: Immediate mitigation is tempting because of Sofia's pressure and the apparent severity, but it skips analysis of a risk that has not yet occurred.
📘 Free lesson: Risk process and the risk register
Question 8 People · Hybrid
During a design review attended by twenty people, Viktor, a senior stakeholder, interrupts the project manager, criticises the team's work in front of everyone and questions the project manager's competence. Several of his statements are inaccurate, and the project manager has test data on the screen that would disprove them. The room falls silent, and the team looks to the project manager. What is the BEST response?
Show the answer and explanation
Answer: B. It keeps the meeting productive, shows composure, and moves the disagreement to a private setting where facts can be discussed without either party losing face, unlike an immediate public rebuttal.
🗝 Key words: “criticises the team's work in front of everyone”
PMP rule: Handle public conflict with senior stakeholders calmly and resolve the disagreement privately, preserving both the relationship and the meeting's purpose.
Why the other answers are wrong:
- A. Disproving a senior stakeholder publicly, even with accurate data, is likely to escalate the conflict and harm the relationship. The facts can be corrected privately and then confirmed to the team.
- C. Stopping the meeting wastes everyone's time and suggests the PM cannot handle the situation. It also leaves the inaccurate criticism unanswered and the concern unexplored.
- D. This places the team in a public confrontation with a senior stakeholder. The PM should protect the team and manage the stakeholder relationship directly.
The trap: Correcting the facts immediately is tempting because the data is on screen and the criticism is wrong, but a public rebuttal escalates the conflict.
📘 Free lesson: Conflict management: five techniques and when to use each
Question 9 People · Hybrid
Whenever two senior team members disagree, the project manager emphasises their shared goals and moves the meeting on. The same disagreement has now resurfaced four times, each time later in the schedule and with more work already built on the unresolved assumption. What should the project manager do?
Show the answer and explanation
Answer: A. Smoothing has been tried four times and has failed four times. Collaborating on the substance is the only mode that removes the disagreement rather than postponing it.
🗝 Key words: “resurfaced four times”
PMP rule: Smoothing defers conflict at compounding cost. When a disagreement recurs, the underlying issue has never been addressed.
Why the other answers are wrong:
- B. Forcing produces a decision but leaves one senior member uncommitted to work he must now support.
- C. Smoothing is the technique that produced this situation. Repeating it guarantees a fifth recurrence at higher cost.
- D. Circulating two positions informs everyone of a disagreement without resolving it.
The trap: Avoiding conflict between senior people feels like good judgement. The repetition count is the evidence it is not working.
📘 Free lesson: Conflict management: five techniques and when to use each
Question 10 Process · Predictive
During a design review the project manager finds that an engineer has added a data-logging function to a control system. The customer did not request it and it is not in the requirements. The engineer explains it took only a day and the customer will appreciate it. What should the project manager do?
Show the answer and explanation
Answer: A. This is gold plating. Unrequested scope carries testing, documentation, validation and warranty obligations, and it was never assessed or approved.
🗝 Key words: “the customer did not request it”
PMP rule: Gold plating is scope the customer never asked for. Extra is not free — it carries test, documentation and warranty cost.
Why the other answers are wrong:
- B. Offering it free creates an expectation, a support obligation and a precedent, and the customer may not want it at all.
- C. Change control exists to assess proposed changes, not to retrospectively legitimise work that should not have been started.
- D. Shipping an untested, undocumented function is the worst available outcome and creates direct warranty exposure.
The trap: 'Only a day' frames the cost as trivial. The development time is the smallest part of what an unrequested function costs.
📘 Free lesson: WBS and the scope baseline
Question 11 Process · Predictive
A project has a budget at completion of $800,000. Earned value is $300,000, actual cost is $375,000 and planned value is $320,000. The sponsor asks for the estimate at completion, assuming current cost performance continues. What should the project manager report?
Show the answer and explanation
Answer: D. CPI = 300,000 ÷ 375,000 = 0.8. Where current cost performance is expected to continue, EAC = BAC ÷ CPI = 800,000 ÷ 0.8 = $1,000,000.
🗝 Key words: “assuming current cost performance continues”
PMP rule: EAC = BAC ÷ CPI when current performance is expected to continue. When the variance is atypical, EAC = AC + (BAC − EV).
Why the other answers are wrong:
- A. BAC is the original budget. It is not a forecast and takes no account of performance to date.
- B. This is the EAC formula for a variance considered atypical, which contradicts the stated assumption that current performance continues.
- C. AC plus remaining BAC also assumes the rest of the work runs at plan, which again contradicts the assumption given.
The trap: Several EAC formulas exist and each is right under a different assumption. That clause is what selects the formula — it is not filler.
📘 Free lesson: Earned value basics: PV, EV, AC, variances and performance indexes
Question 12 Process · Predictive
Activity K has an early start of day 20, an early finish of day 28, a late start of day 26 and a late finish of day 34. The successor activity has an early start of day 30. The project manager is asked how long Activity K could be delayed without affecting anything. What is the correct answer?
Show the answer and explanation
Answer: A. Free float is the successor's early start minus this activity's early finish: 30 − 28 = 2 days. Total float is LS − ES = 26 − 20 = 6 days, which is the delay tolerable before the project finish moves.
🗝 Key words: “without affecting anything”
PMP rule: Free float is delay available before the next activity slips. Total float is delay available before the project finish slips.
Why the other answers are wrong:
- B. The two figures are reversed. Free float is the smaller number here.
- C. Six days is total float only. Delaying six days would push the successor's start by four days.
- D. Two days is free float only. The project has more tolerance than that before its finish date moves.
The trap: The question deliberately blurs the two floats. The successor's early start is given for one calculation and the late start for the other.
📘 Free lesson: Critical path and float: forward pass, backward pass and what they mean
Question 13 Process · Predictive
A control chart for a machining process on the project shows all measurements inside the upper and lower control limits. However, the last eight consecutive points fall above the mean, forming a steady upward drift. The production supervisor, Karim, says that the process is fine because nothing has crossed a limit, and asks to continue without changes. What should the project manager conclude?
Show the answer and explanation
Answer: D. Under the rule of seven, eight consecutive points above the mean show a special cause even within the limits, so investigation is needed, which Karim's limit-only view misses.
🗝 Key words: “last eight consecutive points fall above the mean”
PMP rule: The rule of seven: seven or more consecutive points on one side of the mean indicate an out-of-control process requiring investigation.
Why the other answers are wrong:
- A. This is Karim's view, but a run of seven or more consecutive points on one side of the mean signals a non-random pattern, so the process is not in control.
- B. Control limits are not specification limits. The data show a trend, not that parts are out of specification, so scrapping them is not justified.
- C. Recalculating the limits would hide the trend instead of finding its cause. Limits should be reset only after the process is understood and stable.
The trap: Saying the process is in control is tempting because no point crosses a limit and the supervisor says so.
📘 Free lesson: The quality tools: which one, when?
Question 14 Process · Hybrid
A project has logged 340 defects across eleven categories in the last quarter. The team has limited capacity for improvement work and wants to know where to focus it. Nikos, the quality lead, suggests starting with a cause and effect workshop because 'we need to find root causes'. The project manager wants to choose the technique that best answers the team's question. Which technique should the project manager apply FIRST?
Show the answer and explanation
Answer: A. With limited capacity, the team must first know where most defects come from. Pareto ranks the categories; a cause and effect diagram can then explore causes of the top ones.
🗝 Key words: “wants to know where to focus it”
PMP rule: Pareto analysis focuses limited improvement effort on the few causes that produce most of the problems.
Why the other answers are wrong:
- B. A control chart shows stability over time but does not show which categories to focus on, which is the team's question.
- C. Root cause analysis is useful, but with eleven categories the team first needs to know which ones matter most. Fishbone analysis comes after prioritisation.
- D. A scatter diagram tests a relationship between two variables, but the team has not yet identified which defect categories deserve attention.
The trap: A cause and effect diagram is tempting because root causes matter and the quality lead suggests it, but prioritisation must come first.
📘 Free lesson: The quality tools: which one, when?
Question 15 Process · Predictive
A project carries a low-probability risk that, if it occurred, would cause losses far greater than the project's total budget. The organisation could not absorb such a loss, and the activity cannot be avoided because it is central to the scope. The sponsor, Marta, has confirmed that the risk remains the project's responsibility. Specialist insurers offer cover at a premium the budget can carry. What response should the project manager consider?
Show the answer and explanation
Answer: D. Transfer moves the financial impact of a low-probability, high-impact risk to a party able to bear it. Unlike escalation, it uses an available response within the project's authority.
🗝 Key words: “could not absorb such a loss”
PMP rule: For low-probability, catastrophic-impact threats that cannot be avoided, transfer the financial impact through insurance or contract.
Why the other answers are wrong:
- A. Acceptance fits risks the organisation can absorb. Here the loss would be catastrophic, so low probability alone does not justify acceptance.
- B. Further mitigation reduces probability, but the impact would still be catastrophic. The key need is to protect the organisation from a loss it cannot absorb.
- C. Escalation suits risks outside the project's authority, but Marta has confirmed it stays with the project, and an affordable response is available within it.
The trap: Escalation is tempting because the loss exceeds the project budget, but the sponsor has kept the risk within the project.
📘 Free lesson: Risk process and the risk register
Question 16 Process · Hybrid
To reduce the risk of a supplier delay, the project manager decides to dual source a critical component. Reviewing the plan, a team member points out that using two suppliers will introduce variation between units and complicate spare parts management. What should the project manager do with this second risk?
Show the answer and explanation
Answer: A. A secondary risk is one created by implementing a risk response. Dual sourcing is the response; the variation and spares issue is its offspring.
🗝 Key words: “arising from the chosen response”
PMP rule: Secondary risk is created by a response. Residual risk is what remains after it. Both are identified and managed.
Why the other answers are wrong:
- B. Residual risk is what remains of the original risk after the response — here, whatever delay exposure survives dual sourcing. This is a different thing.
- C. Risks are not dismissed by comparison. Both are managed; they are not in competition.
- D. Almost every response creates some secondary risk. Reversing on that basis would leave no response available at all.
The trap: Secondary and residual are easily swapped. Ask whether the risk was created by the response or merely survived it.
📘 Free lesson: Risk process and the risk register
Question 17 Process · Agile
At the end of each iteration a team holds a single ninety-minute meeting where it demonstrates completed work to stakeholders and, in the same session, discusses how the team could work better. Stakeholders remain in the room throughout. Team members have become reluctant to raise process problems. What should the project manager do?
Show the answer and explanation
Answer: A. The review demonstrates the increment and gathers stakeholder feedback. The retrospective is the team's own inspection of how it works, and it needs the team's own space to be candid.
🗝 Key words: “reluctant to raise process problems”
PMP rule: The review is about the product and includes stakeholders. The retrospective is about the team's process and belongs to the team.
Why the other answers are wrong:
- B. Reordering does not change who is in the room, which is what is suppressing candour.
- C. Silent observers still inhibit honest discussion of the team's own shortcomings.
- D. Anonymous written input is a workaround for a room that should not contain those people in the first place.
The trap: The format looks efficient — one meeting instead of two. Efficiency is why the two purposes got collapsed, and why the retrospective stopped working.
📘 Free lesson: The Sprint Retrospective: improving how the team works
Question 18 Business Environment · Hybrid
In a corridor conversation, Marta, a senior vice president, asks the project manager to start work immediately on a new supplier-onboarding initiative. She says the charter 'will follow in due course' and that this is her top priority for the year. The work will need engineers, buyers and analysts from three different departments, whose managers have not yet heard about it. What should the project manager do FIRST?
Show the answer and explanation
Answer: C. The charter formally authorises the project and the project manager's use of organisational resources. It beats the email option, because a record of a request is not an authorisation.
🗝 Key words: “will follow in due course”
PMP rule: The project charter authorises the project and gives the project manager authority to apply organisational resources; work should not begin without it.
Why the other answers are wrong:
- A. Informal planning uses people's time without authority and normalises starting work that has not been authorised. The charter should come before the work, not after it.
- B. Department managers have no basis to release staff to an initiative that does not formally exist. Their agreement depends on the authority the charter provides.
- D. This is tempting because it creates evidence, but an email only records who asked; it does not authorise the project or give the project manager authority over resources.
The trap: The email option feels like responsible documentation, and the executive's seniority feels like enough authority, but only the charter authorises the project and the use of resources.
📘 Free lesson: The project charter: the official 'go'
Question 19 People · Predictive
During design reviews a team member who disagrees with the direction says nothing, then afterwards tells colleagues privately that the approach will not work. Two of his concerns have since proved correct and caused rework. What should the project manager do first?
Show the answer and explanation
Answer: B. Withdrawal is a conflict-avoidance response, and it has a cause — hierarchy, past experience, language, or something else. Ask the person before designing a remedy.
🗝 Key words: “two of his concerns have since proved correct”
PMP rule: Withdrawal is a conflict mode with a cause. Understand the cause from the person before changing the process around them.
Why the other answers are wrong:
- A. Naming the pattern in front of the team exposes him publicly and makes it less likely, not more, that he speaks next time.
- C. A written channel works around the silence without addressing why it exists, and keeps him out of the live discussion.
- D. Forcing a stated position may extract a yes from someone who is avoiding conflict. Compliance under procedure is not candour.
The trap: Being right makes the rework feel like his fault. The exam is asking why the environment is not getting his input, not how to penalise him.
📘 Free lesson: Conflict management: five techniques and when to use each
Question 20 People · Hybrid
Beatriz, head of the finance department that will use a new billing system, has criticised the project openly in two leadership meetings and declined two invitations to review progress. Using a stakeholder engagement assessment matrix, the project manager rates her current engagement as resistant and the desired level as supportive. The sponsor offers to 'have a word with her' and tell her to take part. What should the project manager do NEXT?
Show the answer and explanation
Answer: D. The matrix shows the gap, and closing it starts with understanding why she resists. A direct conversation beats escalating to the sponsor, which should come only if this fails.
🗝 Key words: “rates her current engagement as resistant”
PMP rule: The engagement assessment matrix shows the gap; a tailored conversation closes it. Try at your own level before escalating.
Why the other answers are wrong:
- A. A sponsor's instruction may produce attendance but not support, and escalating before trying at the project manager's own level can harden her resistance.
- B. Bypassing a department head to reach her staff damages the relationship and will be discovered, deepening the resistance the project needs to reduce.
- C. Reports inform but do not move someone from resistant to supportive; engagement needs a two-way conversation about her concerns.
The trap: The sponsor's offer is tempting because it comes from authority and seems quick, but directing someone to attend produces attendance, not support, and skips the project manager's own attempt.
📘 Free lesson: Identifying and analysing stakeholders
Topic questions (21)
Question 21 Project charter
A senior executive tells you to start a project immediately and says the charter will be written later. What should you do first?
Show the answer and explanation
Answer: C. The charter authorizes the project and the PM's use of resources. A verbal instruction, even from a senior executive, is not enough.
🗝 Key words: “the charter will be written later”
PMP rule: PROJECT NOT YET AUTHORIZED
📘 Free lesson: The project charter: the official 'go'
Question 22 Project charter
A hybrid project will use sprints for software and a fixed plan for installation. Is a project charter needed?
Show the answer and explanation
Answer: B. The approach does not change authorization. A team charter is a different document (working agreements).
🗝 Key words: “Is a project charter needed?”
PMP rule: CHARTER APPLIES TO EVERY APPROACH
📘 Free lesson: The project charter: the official 'go'
Question 23 Project charter
A project manager is named in a signed charter, but a department manager says the PM has no authority to ask his staff for work estimates. What should the PM do?
Show the answer and explanation
Answer: B. The charter is what establishes the PM's authority; use it, and agree a practical way of working.
🗝 Key words: “has no authority”
PMP rule: CHARTER GIVES THE AUTHORITY
📘 Free lesson: The project charter: the official 'go'
Question 24 Conflict management
Two team members disagree about a technical approach. What should the PM do first?
Show the answer and explanation
Answer: B. Direct collaboration first.
🗝 Key words: “disagree about a technical approach”
PMP rule: CONFLICT → COLLABORATE FIRST
📘 Free lesson: Conflict management: five techniques and when to use each
Question 25 Conflict management
There is an immediate safety hazard and team members disagree about stopping the line. Which conflict approach fits?
Show the answer and explanation
Answer: B. In an emergency, direct action is justified.
🗝 Key words: “immediate safety hazard”
PMP rule: EMERGENCY → FORCE/DIRECT
📘 Free lesson: Conflict management: five techniques and when to use each
Question 26 Stakeholders: identify, engage, monitor
Late in the project, a new influential stakeholder appears. What should the PM do first?
Show the answer and explanation
Answer: B. Identification continues throughout the project.
🗝 Key words: “a new influential stakeholder appears”
PMP rule: NEW STAKEHOLDER → REGISTER + ANALYZE
📘 Free lesson: Identifying and analysing stakeholders
Question 27 Stakeholders: identify, engage, monitor
A key stakeholder is resistant. Which approach best reflects stakeholder engagement?
Show the answer and explanation
Answer: B. Engagement is two-way: listen and address concerns.
🗝 Key words: “is resistant”
PMP rule: RESISTANCE → ENGAGE, LISTEN
📘 Free lesson: Identifying and analysing stakeholders
Question 28 Scope planning: requirements, WBS, baseline
The team adds a feature the customer did not request because they think the customer will like it. This is:
Show the answer and explanation
Answer: B. Unrequested work adds cost and risk; it's gold plating.
🗝 Key words: “the customer did not request”
PMP rule: GOLD PLATING
📘 Free lesson: WBS and the scope baseline
Question 29 Scope planning: requirements, WBS, baseline
What makes up the scope baseline?
Show the answer and explanation
Answer: B. These three approved items form the scope baseline.
🗝 Key words: “scope baseline”
PMP rule: SCOPE STATEMENT + WBS + WBS DICTIONARY
📘 Free lesson: WBS and the scope baseline
Question 30 Critical path, float, crashing, fast tracking
An activity with 3 days of float is delayed by 2 days. What happens to the project end date?
Show the answer and explanation
Answer: C. The delay is within float, so the end date holds; 3 − 2 = 1 day of float remains, so the path is now near-critical.
🗝 Key words: “3 days of float is delayed by 2 days”
PMP rule: DELAY < FLOAT → END DATE HOLDS
📘 Free lesson: Critical path and float: forward pass, backward pass and what they mean
Question 31 Critical path, float, crashing, fast tracking
The schedule must be shortened without adding cost. Which technique fits?
Show the answer and explanation
Answer: B. Fast tracking overlaps work; it adds risk but not direct cost. Crashing adds cost.
🗝 Key words: “without adding cost”
PMP rule: FAST TRACKING, NOT CRASHING
📘 Free lesson: Critical path and float: forward pass, backward pass and what they mean
Question 32 Earned value: CPI, SPI, EAC, ETC, VAC
A project has CPI = 0.85 and SPI = 1.10. What does this mean?
Show the answer and explanation
Answer: C. CPI < 1 = spending more than planned for the work done. SPI > 1 = more work done than planned.
🗝 Key words: “CPI = 0.85 and SPI = 1.10”
PMP rule: CPI < 1 OVER BUDGET · SPI > 1 AHEAD
📘 Free lesson: Earned value basics: PV, EV, AC, variances and performance indexes
Question 33 Earned value: CPI, SPI, EAC, ETC, VAC
PV = 200, EV = 160, AC = 180. What is the SPI?
Show the answer and explanation
Answer: A. SPI = EV ÷ PV = 160 ÷ 200 = 0.80, so behind schedule. (CPI = 160 ÷ 180 ≈ 0.89, over budget.)
🗝 Key words: “What is the SPI?”
PMP rule: SPI = EV ÷ PV
📘 Free lesson: Earned value basics: PV, EV, AC, variances and performance indexes
Question 34 Risk responses: escalate, avoid, transfer, mitigate, accept
A risk identified during planning has just occurred. What should the PM do?
Show the answer and explanation
Answer: B. The response was already planned; the risk owner carries it out.
🗝 Key words: “identified during planning has just occurred”
PMP rule: PLANNED RISK OCCURRED → IMPLEMENT RESPONSE
📘 Free lesson: Risk process and the risk register
Question 35 Risk responses: escalate, avoid, transfer, mitigate, accept
The team uses a proven gripper instead of a new design to eliminate a technical risk. This response is:
Show the answer and explanation
Answer: C. Changing the plan to remove the threat is avoidance.
🗝 Key words: “to eliminate a technical risk”
PMP rule: ELIMINATE = AVOID
📘 Free lesson: Risk process and the risk register
Question 36 Quality tools: Pareto, fishbone, control chart
The team wants to decide which defect types to fix first, based on how often they occur. Which tool fits best?
Show the answer and explanation
Answer: B. Pareto ranks causes by frequency.
🗝 Key words: “based on how often they occur”
PMP rule: FREQUENCY RANKING = PARETO
📘 Free lesson: The quality tools: which one, when?
Question 37 Quality tools: Pareto, fishbone, control chart
Where do specification limits and control limits come from?
Show the answer and explanation
Answer: B. Spec = customer's voice. Control = process's voice.
🗝 Key words: “specification limits and control limits”
PMP rule: SPEC = CUSTOMER · CONTROL = PROCESS
📘 Free lesson: The quality tools: which one, when?
Question 38 Retrospective
The team keeps losing time because hand-offs between developers and testers are unclear. Where is the best place to address this?
Show the answer and explanation
Answer: C. A recurring problem with how the team works is a process issue: the retrospective.
🗝 Key words: “hand-offs between developers and testers are unclear”
PMP rule: HOW THE TEAM WORKED → RETROSPECTIVE
📘 Free lesson: The Sprint Retrospective: improving how the team works
Question 39 Retrospective
What is the main difference between a sprint retrospective and a sprint review?
Show the answer and explanation
Answer: B. Retro = how we work. Review = what we built, with stakeholders.
🗝 Key words: “retrospective and a sprint review”
PMP rule: PROCESS vs PRODUCT
📘 Free lesson: The Sprint Retrospective: improving how the team works
Question 40 Definition of Done
At the end of the sprint, a story has been coded but not tested. The Definition of Done requires testing. What happens?
Show the answer and explanation
Answer: C. No partial credit. Not meeting the DoD = not done.
🗝 Key words: “coded but not tested”
PMP rule: NOT MEETING DoD = NOT DONE
📘 Free lesson: Definition of Done and Definition of Ready
Question 41 Definition of Done
What is the difference between the Definition of Done and acceptance criteria?
Show the answer and explanation
Answer: B. DoD = team-wide checklist. Acceptance criteria = story-specific conditions.
🗝 Key words: “Definition of Done and acceptance criteria”
PMP rule: ALL ITEMS vs ONE STORY
📘 Free lesson: Definition of Done and Definition of Ready
2,000 PMP exam questions, every answer explained, timed 180-question exams, your mistake list and 96 lessons.
Practice more PMP questions →Creating an account is free. Full access is free for a limited time after you sign up; after that you can choose a paid plan. Your progress stays saved.